✨ New Arrivals Just Dropped!Explore
Benchnic Table Wood Project Plan
HomeStore

Benchnic Table Wood Project Plan

Benchnic Table Wood Project Plan

$5.41

Original: $15.45

-65%
Benchnic Table Wood Project Plan

$15.45

$5.41

The Story

This Winfield exclusive designed bench transforms into a one-sided table, or you can slide two benches together to make a full-size picnic table. (Dimensions: 29" Tall X 72" Long X 15" Wide)

There is a convenient kit containing all the necessary hardware available separately below (#YF4KIT).

More Info
Dimensions: Bench is 29" tall and 72" long and 15" wide

Wood:
1-1/2" thick pine or hardwood (knot-free).
For the best look, select a #1 grade wood. If you don't mind the look of knots, use a lower cost #2 grade lumber.

Amount:
Two 2X4 x 8' long boards
One 2X10 x 8' long board
Four 2X8 x 8' long boards

Saw:
Table saw

Winfield Parts:
Wooden Knobes - Two 1-1/2" dia. (#KN15)
Wood Plugs - One package 3/8" dia. Birch (#PLG375) (requires 32)
Hardware Kit - One (#YF4KIT)

Sealer: High-grade, non-yellowing, semi-gloss UV protected project sealer (#POLYQT) for outdoor protection.

Description

This Winfield exclusive designed bench transforms into a one-sided table, or you can slide two benches together to make a full-size picnic table. (Dimensions: 29" Tall X 72" Long X 15" Wide)

There is a convenient kit containing all the necessary hardware available separately below (#YF4KIT).

More Info
Dimensions: Bench is 29" tall and 72" long and 15" wide

Wood:
1-1/2" thick pine or hardwood (knot-free).
For the best look, select a #1 grade wood. If you don't mind the look of knots, use a lower cost #2 grade lumber.

Amount:
Two 2X4 x 8' long boards
One 2X10 x 8' long board
Four 2X8 x 8' long boards

Saw:
Table saw

Winfield Parts:
Wooden Knobes - Two 1-1/2" dia. (#KN15)
Wood Plugs - One package 3/8" dia. Birch (#PLG375) (requires 32)
Hardware Kit - One (#YF4KIT)

Sealer: High-grade, non-yellowing, semi-gloss UV protected project sealer (#POLYQT) for outdoor protection.
Benchnic Table Wood Project Plan | The Winfield Collection