✨ New Arrivals Just Dropped!Explore
$3.31
Original: $9.45
-65%Peeking Moose Woodcrafting Project Plan—
$9.45
$3.31The Story
Mostly hidden, this grumpy, peeking moose will add humor to any yard. Make him with the front hoof or rear projection. Our full-size pattern includes painting details and complete instructions for tree attachment. (35" tall)
Dimensions: 35" tall
Wood:
one 24" x 36" x 1/2" thick piece of exterior plywood
Tools:
hand held sabre saw (jig saw) with a smooth cutting
non-chipping blade
phillips screwdriver
electric drill
3/16 " dia. drill bit
Hardware: required for assembly
screws- four #10 x 3" long, flat head
screws- two #10 x 1/2" long, flat head
screw- one #10 x 2" long, flat head
L-bracket- one 4" x 4" steel
Supplies:
transfer paper (#CARB), pencil & clear tape
sand paper- medium & fine grits
wood filler- non shrinking, fast drying for wood flaws and filling screw holes (#WF8)
paint brushes- 3/4" and 1/4" wide brushes and a fine tip detail brush
wood glue- exterior
Paint:
white water base primer for a base coat (#PRIMQT)
2020-red iron oxide
2023-brown iron
2057-quaker grey
2488-mudstone
2505-white
2506-black
Sealer:
high-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT)
More Info
Description: Peeking MooseDimensions: 35" tall
Wood:
one 24" x 36" x 1/2" thick piece of exterior plywood
Tools:
hand held sabre saw (jig saw) with a smooth cutting
non-chipping blade
phillips screwdriver
electric drill
3/16 " dia. drill bit
Hardware: required for assembly
screws- four #10 x 3" long, flat head
screws- two #10 x 1/2" long, flat head
screw- one #10 x 2" long, flat head
L-bracket- one 4" x 4" steel
Supplies:
transfer paper (#CARB), pencil & clear tape
sand paper- medium & fine grits
wood filler- non shrinking, fast drying for wood flaws and filling screw holes (#WF8)
paint brushes- 3/4" and 1/4" wide brushes and a fine tip detail brush
wood glue- exterior
Paint:
white water base primer for a base coat (#PRIMQT)
2020-red iron oxide
2023-brown iron
2057-quaker grey
2488-mudstone
2505-white
2506-black
Sealer:
high-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT)
Description
Mostly hidden, this grumpy, peeking moose will add humor to any yard. Make him with the front hoof or rear projection. Our full-size pattern includes painting details and complete instructions for tree attachment. (35" tall)
Dimensions: 35" tall
Wood:
one 24" x 36" x 1/2" thick piece of exterior plywood
Tools:
hand held sabre saw (jig saw) with a smooth cutting
non-chipping blade
phillips screwdriver
electric drill
3/16 " dia. drill bit
Hardware: required for assembly
screws- four #10 x 3" long, flat head
screws- two #10 x 1/2" long, flat head
screw- one #10 x 2" long, flat head
L-bracket- one 4" x 4" steel
Supplies:
transfer paper (#CARB), pencil & clear tape
sand paper- medium & fine grits
wood filler- non shrinking, fast drying for wood flaws and filling screw holes (#WF8)
paint brushes- 3/4" and 1/4" wide brushes and a fine tip detail brush
wood glue- exterior
Paint:
white water base primer for a base coat (#PRIMQT)
2020-red iron oxide
2023-brown iron
2057-quaker grey
2488-mudstone
2505-white
2506-black
Sealer:
high-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT)
More Info
Description: Peeking MooseDimensions: 35" tall
Wood:
one 24" x 36" x 1/2" thick piece of exterior plywood
Tools:
hand held sabre saw (jig saw) with a smooth cutting
non-chipping blade
phillips screwdriver
electric drill
3/16 " dia. drill bit
Hardware: required for assembly
screws- four #10 x 3" long, flat head
screws- two #10 x 1/2" long, flat head
screw- one #10 x 2" long, flat head
L-bracket- one 4" x 4" steel
Supplies:
transfer paper (#CARB), pencil & clear tape
sand paper- medium & fine grits
wood filler- non shrinking, fast drying for wood flaws and filling screw holes (#WF8)
paint brushes- 3/4" and 1/4" wide brushes and a fine tip detail brush
wood glue- exterior
Paint:
white water base primer for a base coat (#PRIMQT)
2020-red iron oxide
2023-brown iron
2057-quaker grey
2488-mudstone
2505-white
2506-black
Sealer:
high-grade, non-yellowing, semi-gloss UV protected project sealer for outdoor protection (#POLYQT)












